Pre-budget
Honest triage before the distributor's connection quote
Data: 22/07/2026 · MWatt Hub catalog
14 data products and 20 calculators, built on official sources. Search, open, share the URL. Every figure with source and date.
1,774 TUST busbars · cycle 2026/2027 (Despacho nº 2.269/2026) · 931 substations in the connection queue · 283 plants with measured curtailment
Read our data-honesty commitment → (in Portuguese)
An occasional email with what the data showed — monthly curtailment, new tariff cycles, Access Season milestones — always with figure, source and method. No spam, no list selling.
37 of 37
Honest triage before the distributor's connection quote
Where is a utility-scale battery worth it in Brazil?
Is rooftop solar worth it at your home?
Mine bitcoin at home or buy it?
AI agent for power-system studies
What AI agents already deliver in grid studies and what still depends on an engineer — task by task, judged by whether the result is verifiable
The actual path for generation and load: owners, timelines, common failures and tools at each step
Find which path to evaluate first: bill audit, benefit, solar, subscription, time-of-use or efficiency
Got an offer? Calculate the effective discount after wire B, minimum billing and public lighting
Is switching worthwhile? Compare peak, shoulder and off-peak rates with the standard tariff
Check eligibility and simulate the first 80 kWh of free electricity
Is your power bill correct? Open reconstruction with tariff, flag, minimum bill, wire B and taxes
Large generator on the Basic Grid via ONS — official margins, access study, queue and PLD
Data center, mining and BESS as large load — access, grid study and connection cost
Hourly PLD forecast, with a public track record
TUST by busbar, without mining ANEEL spreadsheets
How much wind and solar did Brazil curtail?
Basic Grid access, by substation
AI data centers in Brazil — map and ranking
Where does the money go in a Brazilian power plant?
Where in the world is power cheap enough to mine bitcoin?
What's hot in the power sector, measured — not guessed
Track home electricity use from meter readings, bills or smart-meter data
Estimated DG hosting capacity per feeder — 51 utilities / all 27 Brazilian federative units (BDGD)
Visualize pandapower networks directly in your browser
Current flag, history and bill calculator (kWh × surcharge) — ANEEL
Current hourly PLD by submarket and next 12 h (Spotcast)
What 30 utilities publish (map, portal, forms) — shortcut to Pre-budget
The minimum monthly charge for each of Brazil's 51 distribution utilities
MMGD connection deadline table from REN 1.000/2021, article by article
Local, remote, shared and multi-UC — Law 14.300 definitions and which to choose
SCEE, credits (60 months), wire-B schedule (2026 = 60%) and rights until 2045
PLD, TUST, MMGD, SIN and other terms — neutral definition with link to official source
Honesty commitment — source and date on every figure