How much wind and solar generation has Brazil curtailed?

History of constrained-off (generation curtailment ordered by system operations) on the SIN (the national grid), reported by ONS by plant and 30-minute period. Data through June 2026 (next month expected: July — ONS publication pattern)methodology and limitations.

New Waste 2025 — the 20 plants that wasted the most energy (in Portuguese), with curtailment valued hour by hour at PLD (Brazil's spot price).

Energy curtailed in period

39,0 TWh

Jul/25 – Jun/26

Curtailment rate in period

21,5%

curtailment ÷ (generation + curtailment)

Curtailment in June 2026

2,74 TWh

−14% vs previous month

Share from energy reason (ENE)

61,3%

non-compensable (Law 15.269/2025)

Monthly curtailment by reason — Wind

Energy curtailed (TWh) by restriction reason

  • Energy reason (ENE)
  • Reliability (CNF)
  • External unavailability (REL)
MonthEnergyReliabilityExt. unavail.Total
Jul/251,32 TWh935 GWh95,1 GWh2,35 TWh
Aug/251,70 TWh1,26 TWh174 GWh3,13 TWh
Sep/252,08 TWh1,54 TWh95,0 GWh3,71 TWh
Oct/252,24 TWh2,52 TWh80,3 GWh4,83 TWh
Nov/251,58 TWh915 GWh38,2 GWh2,54 TWh
Dec/251,01 TWh557 GWh39,8 GWh1,61 TWh
Jan/26698 GWh1,10 TWh604 GWh2,41 TWh
Feb/26371 GWh42,0 GWh79,4 GWh493 GWh
Mar/26711 GWh65,0 GWh56,1 GWh832 GWh
Apr/26988 GWh231 GWh173 GWh1,39 TWh
May/261,47 TWh229 GWh342 GWh2,04 TWh
Jun/261,08 TWh423 GWh243 GWh1,75 TWh

Monthly curtailment by reason — Solar

Energy curtailed (TWh) by restriction reason

  • Energy reason (ENE)
  • Reliability (CNF)
  • External unavailability (REL)
MonthEnergyReliabilityExt. unavail.Total
Jul/25703 GWh261 GWh68,8 GWh1,03 TWh
Aug/25871 GWh463 GWh55,8 GWh1,39 TWh
Sep/25858 GWh422 GWh77,8 GWh1,36 TWh
Oct/25829 GWh428 GWh80,0 GWh1,34 TWh
Nov/25735 GWh181 GWh67,9 GWh984 GWh
Dec/25519 GWh120 GWh19,9 GWh659 GWh
Jan/26338 GWh306 GWh90,1 GWh733 GWh
Feb/26271 GWh41,3 GWh23,8 GWh336 GWh
Mar/26729 GWh59,3 GWh65,1 GWh853 GWh
Apr/26999 GWh25,5 GWh18,9 GWh1,04 TWh
May/261,04 TWh32,6 GWh74,5 GWh1,15 TWh
Jun/26754 GWh36,3 GWh205 GWh995 GWh

Monthly curtailment rate — Wind

curtailment ÷ (verified generation + curtailment), by month

MonthCurtailment rate
Jul/2517,8%
Aug/2521,7%
Sep/2523,8%
Oct/2529,8%
Nov/2522,9%
Dec/2516,1%
Jan/2622,4%
Feb/268,7%
Mar/2612,1%
Apr/2615,9%
May/2617,8%
Jun/2615,6%

Monthly curtailment rate — Solar

curtailment ÷ (verified generation + curtailment), by month

MonthCurtailment rate
Jul/2530,7%
Aug/2536,7%
Sep/2535,0%
Oct/2532,4%
Nov/2525,4%
Dec/2516,8%
Jan/2618,8%
Feb/2610,0%
Mar/2621,2%
Apr/2625,7%
May/2628,6%
Jun/2625,9%

Curtailment by state in period

Energy curtailed by state and reason, Jul/25 – Jun/26

  • Energy reason (ENE)
  • Reliability (CNF)
  • External unavailability (REL)
StateEnergyReliabilityExt. unavail.Total
RN6,23 TWh6,41 TWh256 GWh12,9 TWh
BA6,48 TWh2,44 TWh1,77 TWh10,7 TWh
MG3,57 TWh779 GWh461 GWh4,81 TWh
PI2,90 TWh1,01 TWh207 GWh4,11 TWh
CE2,22 TWh974 GWh116 GWh3,31 TWh
PE860 GWh390 GWh27,1 GWh1,28 TWh
PB600 GWh186 GWh12,4 GWh798 GWh
SP466 GWh308 MWh15,3 GWh482 GWh
RS307 GWh119 MWh180 MWh307 GWh
MA171 GWh5,2 GWh2,2 GWh179 GWh
GO53,1 GWh0 MWh0 MWh53,1 GWh
SC32,8 GWh9 MWh0 MWh32,8 GWh

Most affected plants and clusters in the period

Top 10 by energy curtailed; rate = curtailment ÷ (generation + curtailment)

See all →
Plant / clusterSourceStateCurtailmentCurtailment rate
CONJ. JANAÚBASolarMG918 GWh27,7%
CONJ. ARINOS 2 500 KVSolarMG749 GWh24,4%
CONJ. SERRA DO MEL AWindRN711 GWh31,6%
CONJ. RIO DO VENTOWindRN688 GWh29,3%
CONJ. CAJUWindRN664 GWh23,8%
CONJ. SERRA DO MEL BWindRN618 GWh29,3%
CONJ. RIO DO VENTO EXPANSÃOWindRN577 GWh22,3%
CONJ. SERRA DO ASSURUÁWindBA546 GWh15,9%
CONJ. SANTO AGOSTINHOWindRN546 GWh32,8%
CONJ. CURRAL NOVO DO PIAUÍ II 230 KVWindPI518 GWh12,3%

Frequently asked questions

How much wind and solar generation was curtailed in Brazil in the last 12 months?
The ONS recorded 39,0 TWh of curtailed wind and solar generation in Brazil's interconnected power system from July 2025 to June 2026, according to data aggregated by CORTE. The total covers ENE, CNF, REL, and PAR restrictions affecting the supervised plants and complexes included in the ONS open data.
Which Brazilian state had the most wind and solar curtailment in the last 12 months?
RN had the largest volume of wind and solar curtailment from July 2025 to June 2026, totaling 12,9 TWh. The ranking sums restrictions recorded for ONS-supervised plants and complexes in each state.
Which power plant had the most curtailed energy in Brazil in the last 12 months?
CONJ. JANAÚBA, in MG, ranked first for curtailed energy from July 2025 to June 2026, with 918 GWh. The comparison includes ONS-supervised wind and solar plants and complexes with recorded curtailment during the period.
How is the renewable generation curtailment rate calculated?
The curtailment rate is curtailed energy divided by verified generation plus curtailed energy. For wind and solar generation in Brazil's interconnected system, the aggregate rate from July 2025 to June 2026 was 21,5%.