Pré-orçamento

Connection Pre-budget

before the distributor’s formal connection budget

See what your distributor publishes

Enter location and capacity. You get your distributor’s dossier — hosting capacity map when it exists, access portal, required forms and rules beyond PRODIST — plus the ANEEL regulatory checklist and the prepared budget request. Every item with source and access date; where nothing is published, the gap is declared by name. We never invent network hosting capacity.

No login. Citable result — criterion + source, or declared gap.

What you get

  1. Your case

    MMGD classification, REN 1.000 deadlines, process roadmap, flow reversal, exemptions, protections and rights — each item with a Known/Partial/Gap badge and an official source.

  2. What your distributor publishes

    The heart of the dossier: the MMGD hosting capacity map when it exists — direct link and a 3-line “how to read” — plus the request portal, required forms and rules beyond PRODIST. Without a public source, the gap is declared by name.

  3. Ready next step

    The connection budget request, prepared: the case document checklist, the direct link into the distributor’s flow and the deadline it must meet (art. 64).

30 distributors verified

What each one publishes today — in the dossier, every cell becomes a live link or a named gap.

DistributorCapacity mapAccess portalForms
CEMIG-Dpublishespublishespublishes
CPFL Paulistadoes not publishpublishespublishes
Enel SPdoes not publishpublishespublishes
Copel-DISdoes not publishpublishespublishes
Neoenergia Coelbapublishespublishespublishes
Equatorial Parádoes not publishpublishespublishes
Equatorial Goiásdoes not publishpublishespublishes
Equatorial Maranhãodoes not publishpublishespublishes
Equatorial Alagoasdoes not publishpublishespublishes
Equatorial Piauídoes not publishpublishespublishes
CEEE Equatorialdoes not publishpublishespublishes
Energisa Mato Grossodoes not publishpublishespublishes
Energisa Paraíbadoes not publishpublishespublishes
Energisa Sergipedoes not publishpublishespublishes
Energisa Tocantinsdoes not publishpublishespublishes
Energisa Rondôniadoes not publishpublishespublishes
Light SESAdoes not publishpublishespublishes
Celesc-DISpublishespublishespublishes
EDP São Paulodoes not publishpublishespublishes
EDP Espírito Santodoes not publishpublishespublishes
Neoenergia Pernambucopublishespublishespublishes
Neoenergia Cosernpublishespublishespublishes
Neoenergia Brasíliapublishespublishespublishes
RGEdoes not publishpublishespublishes
Enel CEdoes not publishpublishespublishes
Enel Riodoes not publishpublishespublishes
Amazonas Energiadoes not publishpublishespublishes
CPFL Piratiningadoes not publishpublishespublishes
Neoenergia Elektropublishespublishespublishes
Roraima Energiadoes not publishpublishespublishes

sources verified on 2026-07-20

Another distributor? The result still ships the full ANEEL checklist, with the dossier gap declared by name — we never infer what we have not verified.